Ranges differ by equipment class and by who measured them. DCU never averages
across either, so the full edition shows every figure with its own scope.
EIA figures are national averages, not a facility tariff. For a facility on that grid (PJM):
what is your peak load contribution, and how do capacity charges reach your bill?
Adding 1–5 MW?Powering the next MW
sets out seven paths, what the public record shows for each, and where it shows nothing.